Choosing a standby generator starts with deciding what the home needs during an outage. Floor area alone does not explain the electrical demand, and a headline kilowatt rating does not describe the whole installation. Ask the installer to connect the recommended size to your equipment, fuel supply, and expectations before approving the project.

By Get Climate Ready · November 10, 2026

Start with three sizing decisions

What needs power
List essential equipment and the larger loads you want available during an outage.
What can run together
Ask about motor startup, simultaneous demand, and any automatic load controls.
What the site can support
Confirm fuel capacity, electrical connections, placement, and required approvals.

Which equipment is included in the load assessment?

Make a list of what you want to use during an outage. Start with refrigeration, lighting, communications, and any pumps the home depends on. Then discuss heating or cooling, cooking, water heating, laundry, and electric vehicle charging as separate choices.

Generac’s sizing guidance recommends identifying essential loads, considering starting demand, and having a professional complete a load analysis. Homes with similar floor areas can need different capacity because their equipment and backup priorities differ.

Ask which appliances and circuits the installer checked and what information supports the recommendation. Provide equipment models or accessible nameplate photos if requested. Leave electrical panel inspection and measurements to qualified professionals.

Tell the installer about planned changes, such as another cooling system or a switch to electric appliances. Ask whether the proposed system allows for those loads and how much of that allowance is an assumption.

How will motor startup affect the recommendation?

The power needed to start equipment can differ from what it needs while running. Kohler’s sizing guidance calls for evaluating both starting and running requirements when selecting a home generator.

Ask how the assessment handles your actual air conditioning equipment, well pump, or other motor loads. If several items might start near the same time after an outage, have the installer explain how the proposed system will respond.

A list of typical appliance wattages can help organize a discussion, but it should not replace equipment information or a professional assessment. Ask which manufacturer data, measurements, or calculations were used and what remains to be confirmed.

Will any loads be delayed or temporarily disconnected?

Some standby systems use load controls to prioritize equipment. Ask whether the proposal relies on those controls, which circuits they affect, and how power is restored to a paused load. Generac’s installation guidance treats load management and the transfer switch as parts of system planning.

The phrase whole home should be explained in practical terms. Does the quote support every listed appliance at the same time, or does it depend on automatic priorities or changes in how you use the home?

Turn backup expectations into specific questions
Your priorityQuestion for the installer
Heating and coolingWhich units and heating stages are included, and can they start with the other priority loads?
Well or sump pumpsHow are their starting requirements and priority handled?
Large electric appliancesCan cooking, water heating, laundry, or vehicle charging run together, or are there restrictions?
Sensitive equipmentDoes it need separate power quality checks or backup during the transfer interval?
Future additionsWhich planned loads are included in the current recommendation?

If someone depends on powered medical equipment, discuss interruption limits and a separate contingency plan with the equipment provider and care team. Automatic standby power should not be assumed to provide uninterrupted operation.

Can the fuel supply support the generator and the home?

Generac’s installation guidance includes fuel selection and supply sizing alongside electrical planning. Ask the installer and fuel professional to verify the proposed arrangement rather than assuming an existing gas connection or propane tank is sufficient.

For natural gas, ask whether the meter, regulator, and piping can meet the generator’s needs while other gas appliances operate. Clarify who coordinates any utility work and whether it is included in the price.

For propane, ask which tank and supply conditions the recommendation assumes, how consumption varies with electrical load, and what refill arrangements are practical during a prolonged outage. Request a runtime estimate with its assumptions, rather than treating one number as a promise.

Does the site support the proposed installation?

Sizing is only one part of the decision. Confirm who will assess the transfer equipment, electrical work, fuel work, permits, and inspections. Ask whether site conditions or required upgrades change the proposed model or installation cost.

A June 2025 CPSC staff report identifies carbon monoxide hazards from permanently installed standby generators. These outdoor systems still require careful placement. Have the installer review exhaust exposure, nearby openings and air intakes, manufacturer instructions, and applicable local requirements.

Also ask about flood exposure, access for servicing, noise requirements, and the supporting base. Avoid assuming that a convenient empty space beside the house is suitable. Request a site plan showing the proposed position before installation.

What written record will explain the sizing choice?

Request the load assessment, included circuits, control priorities, fuel assumptions, and exact equipment models with the proposal. Clarify exclusions and the steps needed before the recommendation becomes final.

Ask how the completed installation will be commissioned and demonstrated under the agreed loads. Confirm the operating instructions, maintenance schedule, warranty terms, and service arrangements you will receive. That record helps you understand both the system’s capacity and its limits.

Frequently asked questions

Can I choose generator size from square footage alone?

No. Ask for a load assessment that considers your equipment, starting requirements, and the appliances you want available during an outage.

Does whole home mean everything can run at once?

Ask the installer to define it. The proposal may rely on load priorities or restrictions on simultaneous use.

Why do startup requirements matter?

Some equipment needs more power to start than to keep running. The recommendation should account for the actual equipment and likely combinations of loads.

Does a larger generator automatically mean a longer runtime?

No. Runtime depends on fuel availability, consumption, and the load being served. Ask for an estimate based on the proposed setup.

What should I receive before approving installation?

Request the load assessment, equipment models, supported circuits, fuel requirements, site plan, approvals, and written scope with exclusions.

Prepare a backup power request around your needs

Contact Get Climate Ready for help finding a contractor to discuss standby power. Share the property location, fuel availability, and equipment you want supported so the sizing conversation starts with your household’s priorities.